Greece Project

Another interesting shipment from the impressive Big Apple track record was this project shipment to ship 2 Terex CC3800’s to it’s new home in Greece.
The cranes were purchased using a letter of credit so before one piece had even moved, Pete was called in to check the letter of credit and advise the shipper on any pitfalls financial or logistical.
Pete used his 20 years’ experience of working on high value letters of credit to check and advise and after working with the banks involved, a workable version of the l/c was drafted that made all parties very happy which triggered the shipment moving forward.
A break-bulk part charter was organised with the shipping line and after all parties signed the contracts the shipment commenced.
This was the next hurdle, Pete had to work out how to move two of the biggest cranes in the world on a very tight budget and timescale whilst complying with the stipulations of the l/c.
A deal was done with a shipping line to part-charter a substantial amount of space on a break-bulk vessel and then delivery into Antwerp began.
Pete stayed in Antwerp and supervised the delivery of nearly 100 lorry loads of cargo into Antwerp Quay.
The cargo that Pete is checking in the photos is taking up one entire berth at Antwerp Quay and it is all the cargo for this shipment.
Situations can change rapidly and when the breakbulk vessel arrived in Antwerp it had been loaded differently to the agreed stowage plan so Pete worked very closely with the stevedores and the shipping line to put together some alternative loading plans that were then submitted to the shipper over a SKYPE meeting and a new loading plan was agreed upon within a few hours allowing the stevedores to still load the vessel in time to avoid any additional costs at port.
Pete then stayed in Antwerp a few extra days to ensure that the revised loading plan was followed to the letter. He then flew home to Big Apple HQ and organised the full presentation of l/C documents to the bank and these were accepted first time and customer was paid swiftly and efficiently.
“This easily marks one of those shipments that pushed my skill set to the max” recalls Pete “Having to work with an L/C and a breakbulk charter contract is hard enough without having to come up with a revised plan of action whilst standing at the quay”.
“Long story short, customer was delighted, cargo was loaded and the l/c documents flew through then banking system and customer was paid much sooner than expected”
“I know quite a few larger forwarders that don’t know one end of an L/C from the other let alone being able to check over the difficult legal terminology used in break-bulk chartering contracts”
We may be small, but we’re mighty!